OEE system

  ... transparency pays off

 

 

Fränz & Jaeger delivers complete OEE-Systems (Overall Equipment Effectivness).

With the OEE key figure can be displayed at a glance both the productivity of a unit, as well as their losses.

Downtimes of a production unit are expensive. As a key to the reduction of downtime, the creation of transparency by recording the downtime reasons has been found.

In practice, increases are seen in productivity of over 20% after introduction of this OEE system.

The F&J OEE-System features :

It's easy configured :

The F & J OEE system is individually configurable for the operator for each unit. It is adjustable which standstill reason is planned and therefore the measure does not diminish.

It's low cost :

The system is based on very compact WAGO controllers and is easy integrated in virtually any application. All you need is a signal contact of the production-machine and a start contact to the machine.

It's safe :

All data is stored on a flash card and additionally via FTP or in a database. From there are evaluations that go beyond the already integrated, according to any criteria possible.

OEE key value (source Wikipedia) :

The OEE of a plant is defined as product of the following factors :

The range is between 0 and 1 or 0 and 100 percent.

The OEE is a measure of unplanned loss of a plant. Therefore, the planned downtimes are deducted in the first step of the calendar time (24 hours, 7 days a week). Planned shutdowns could be, for example:

The remaining operating time is the basis for the OEE-figure and is therefore defined as 100%.

Of these 100% now, the performance, availability and quality losses are deducted, so that the overall OEE of the plant is given.

The F&J OEE System in standard configuration calculates the availability factor.

Your benefit :

The benefits of OEE is the transparency of the value added component of the plant, giving the management another view of the system. The index is ideally suited to establish an objective agreement process to this OEE number. Because the figures can be made - due to their comprehensiveness - robust to structural changes in production.

Further information :

Fränz & Jaeger GmbH
Dornkaulstrasse 10
52134 Herzogenrath

Tel: +49-2407 572705 0